|
TCrB (2024-04-30 to 2024-05-01) |
|
|
|
Details: |
Significance at TCrB: | 0.00 sigma |
Flux > 1 TeV at TCrB (cm^-2 s^-1): | 4.24 +/- 4.27 e-310 |
Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
: | |
Total Duration of Map: | 0.75 hrs (0.03 days) |
Wgt Average Int Dur: | 2.25 hrs |
Source Transits: | 0.00 |
|
|
Significance: |
|
|
Differential Flux: |
Min Flux: | 60.40 +/- 0.00 e3 | ( 0.00 deg, 0.00 deg) | Max Flux: | 0.00 +/- 0.00 e-9223372036854775808 | ( 0.00 deg, 0.00 deg) | Flux at TCrB: | 6.91 +/- 6.95 e-310 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
Min Flux: | 37.10 +/- 0.00 e3 | ( 0.00 deg, 0.00 deg) | Max Flux: | 0.00 +/- 0.00 e-9223372036854775808 | ( 0.00 deg, 0.00 deg) | Flux at TCrB: | 4.24 +/- 4.27 e-310 | (at TCrB) | cm^-2 s^-1 |
|
|