|
TCrB (2024-06-15 to 2024-06-16) |
|
|
|
Details: |
Significance at TCrB: | 0.00 sigma |
Flux > 1 TeV at TCrB (cm^-2 s^-1): | -1.29 +/- 0.63 e-11 |
Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
: | |
Total Duration of Map: | 12.25 hrs (0.51 days) |
Wgt Average Int Dur: | 2.16 hrs |
Source Transits: | 1.00 |
|
|
Significance: |
|
|
Differential Flux: |
Min Flux: | -4.70 +/- 1.18 e-11 | (238.80 deg, 22.99 deg) | Max Flux: | 1.61 +/- 0.74 e-11 | (240.21 deg, 22.51 deg) | Flux at TCrB: | -2.10 +/- 1.03 e-11 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
Min Flux: | -2.88 +/- 0.72 e-11 | (238.80 deg, 22.99 deg) | Max Flux: | 9.88 +/- 4.55 e-12 | (240.21 deg, 22.51 deg) | Flux at TCrB: | -1.29 +/- 0.63 e-11 | (at TCrB) | cm^-2 s^-1 |
|
|