|
TCrB (2024-06-21 to 2024-06-22) |
|
|
|
Details: |
Significance at TCrB: | 0.00 sigma |
Flux > 1 TeV at TCrB (cm^-2 s^-1): | 1.61 +/- 2.55 e-12 |
Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
: | |
Total Duration of Map: | 6.00 hrs (0.25 days) |
Wgt Average Int Dur: | 2.17 hrs |
Source Transits: | 0.23 |
|
|
Significance: |
|
|
Differential Flux: |
Min Flux: | -1.55 +/- 0.55 e-11 | (240.03 deg, 23.81 deg) | Max Flux: | 7.66 +/- 4.11 e-12 | (241.00 deg, 24.21 deg) | Flux at TCrB: | 2.63 +/- 4.16 e-12 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
Min Flux: | -9.51 +/- 3.34 e-12 | (240.03 deg, 23.81 deg) | Max Flux: | 4.70 +/- 2.52 e-12 | (241.00 deg, 24.21 deg) | Flux at TCrB: | 1.61 +/- 2.55 e-12 | (at TCrB) | cm^-2 s^-1 |
|
|