|
TCrB (2024-07-10 to 2024-07-11) |
|
|
|
Details: |
Significance at TCrB: | 0.00 sigma |
Flux > 1 TeV at TCrB (cm^-2 s^-1): | -8.78 +/- 47.70 e-13 |
Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
: | |
Total Duration of Map: | 11.50 hrs (0.48 days) |
Wgt Average Int Dur: | 2.15 hrs |
Source Transits: | 0.98 |
|
|
Significance: |
|
|
Differential Flux: |
Min Flux: | -5.90 +/- 1.21 e-11 | (239.06 deg, 23.40 deg) | Max Flux: | 1.53 +/- 0.80 e-11 | (239.33 deg, 22.51 deg) | Flux at TCrB: | -1.43 +/- 7.77 e-12 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
Min Flux: | -3.62 +/- 0.74 e-11 | (239.06 deg, 23.40 deg) | Max Flux: | 9.39 +/- 4.90 e-12 | (239.33 deg, 22.51 deg) | Flux at TCrB: | -8.78 +/- 47.70 e-13 | (at TCrB) | cm^-2 s^-1 |
|
|