|
TCrB (2024-07-30 to 2024-07-31) |
|
|
|
Details: |
Significance at TCrB: | 0.00 sigma |
Flux > 1 TeV at TCrB (cm^-2 s^-1): | -1.66 +/- 0.58 e-11 |
Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
: | |
Total Duration of Map: | 12.00 hrs (0.50 days) |
Wgt Average Int Dur: | 2.16 hrs |
Source Transits: | 1.00 |
|
|
Significance: |
|
|
Differential Flux: |
Min Flux: | -6.49 +/- 1.19 e-11 | (239.85 deg, 22.19 deg) | Max Flux: | 1.62 +/- 0.71 e-11 | (240.38 deg, 24.13 deg) | Flux at TCrB: | -2.71 +/- 0.94 e-11 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
Min Flux: | -3.98 +/- 0.73 e-11 | (239.85 deg, 22.19 deg) | Max Flux: | 9.94 +/- 4.38 e-12 | (240.38 deg, 24.13 deg) | Flux at TCrB: | -1.66 +/- 0.58 e-11 | (at TCrB) | cm^-2 s^-1 |
|
|