|
TCrB (2024-08-27 to 2024-08-28) |
|
|
|
Details: |
Significance at TCrB: | 0.00 sigma |
Flux > 1 TeV at TCrB (cm^-2 s^-1): | -7.98 +/- 4.93 e-12 |
Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
: | |
Total Duration of Map: | 11.97 hrs (0.50 days) |
Wgt Average Int Dur: | 2.18 hrs |
Source Transits: | 0.98 |
|
|
Significance: |
|
|
Differential Flux: |
Min Flux: | -5.67 +/- 1.09 e-11 | (238.62 deg, 24.13 deg) | Max Flux: | 1.65 +/- 0.78 e-11 | (238.54 deg, 21.78 deg) | Flux at TCrB: | -1.30 +/- 0.80 e-11 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
Min Flux: | -3.48 +/- 0.67 e-11 | (238.62 deg, 24.13 deg) | Max Flux: | 1.01 +/- 0.48 e-11 | (238.54 deg, 21.78 deg) | Flux at TCrB: | -7.98 +/- 4.93 e-12 | (at TCrB) | cm^-2 s^-1 |
|
|