|
TCrB (2024-08-31 to 2024-09-01) |
|
|
|
Details: |
Significance at TCrB: | 0.00 sigma |
Flux > 1 TeV at TCrB (cm^-2 s^-1): | -1.69 +/- 0.59 e-11 |
Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
: | |
Total Duration of Map: | 11.25 hrs (0.47 days) |
Wgt Average Int Dur: | 2.18 hrs |
Source Transits: | 0.84 |
|
|
Significance: |
|
|
Differential Flux: |
Min Flux: | -5.09 +/- 1.11 e-11 | (240.38 deg, 22.99 deg) | Max Flux: | 1.65 +/- 0.64 e-11 | (239.06 deg, 21.62 deg) | Flux at TCrB: | -2.76 +/- 0.96 e-11 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
Min Flux: | -3.12 +/- 0.68 e-11 | (240.38 deg, 22.99 deg) | Max Flux: | 1.01 +/- 0.39 e-11 | (239.06 deg, 21.62 deg) | Flux at TCrB: | -1.69 +/- 0.59 e-11 | (at TCrB) | cm^-2 s^-1 |
|
|