|
TCrB (2024-11-30 to 2024-11-30) |
|
|
|
Details: |
Significance at TCrB: | 0.00 sigma |
Flux > 1 TeV at TCrB (cm^-2 s^-1): | -1.74 +/- 3.22 e-12 |
Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
: | |
Total Duration of Map: | 12.00 hrs (0.50 days) |
Wgt Average Int Dur: | 2.18 hrs |
Source Transits: | 0.98 |
|
|
Significance: |
|
|
Differential Flux: |
Min Flux: | -3.70 +/- 1.03 e-11 | (240.73 deg, 22.35 deg) | Max Flux: | 8.59 +/- 6.24 e-12 | (240.56 deg, 21.70 deg) | Flux at TCrB: | -2.84 +/- 5.25 e-12 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
Min Flux: | -2.27 +/- 0.63 e-11 | (240.73 deg, 22.35 deg) | Max Flux: | 5.27 +/- 3.83 e-12 | (240.56 deg, 21.70 deg) | Flux at TCrB: | -1.74 +/- 3.22 e-12 | (at TCrB) | cm^-2 s^-1 |
|
|