|
|
TCrB (2025-02-28 to 2025-02-28) |
|
|
|
Details: |
| Significance at TCrB: | 0.00 sigma |
| Flux > 1 TeV at TCrB (cm^-2 s^-1): | 4.04 +/- 4.34 e-12 |
| Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
| : | |
| Total Duration of Map: | 12.25 hrs (0.51 days) |
| Wgt Average Int Dur: | 2.16 hrs |
| Source Transits: | 1.00 |
|
|
Significance: |
|
|
|
Differential Flux: |
| Min Flux: | -5.21 +/- 1.11 e-11 | (238.89 deg, 24.21 deg) | | Max Flux: | 1.42 +/- 0.77 e-11 | (240.21 deg, 22.67 deg) | | Flux at TCrB: | 6.58 +/- 7.07 e-12 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
| Min Flux: | -3.20 +/- 0.68 e-11 | (238.89 deg, 24.21 deg) | | Max Flux: | 8.72 +/- 4.71 e-12 | (240.21 deg, 22.67 deg) | | Flux at TCrB: | 4.04 +/- 4.34 e-12 | (at TCrB) | cm^-2 s^-1 |
|
|