|
|
TCrB (2025-12-22 to 2025-12-22) |
|
|
|
Details: |
| Significance at TCrB: | 0.00 sigma |
| Flux > 1 TeV at TCrB (cm^-2 s^-1): | -3.25 +/- 3.27 e-12 |
| Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
| : | |
| Total Duration of Map: | 2.50 hrs (0.10 days) |
| Wgt Average Int Dur: | 2.05 hrs |
| Source Transits: | 0.35 |
|
|
Significance: |
|
|
|
Differential Flux: |
| Min Flux: | -3.46 +/- 0.74 e-11 | (241.00 deg, 21.94 deg) | | Max Flux: | 9.23 +/- 4.33 e-12 | (238.71 deg, 23.89 deg) | | Flux at TCrB: | -5.30 +/- 5.33 e-12 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
| Min Flux: | -2.12 +/- 0.45 e-11 | (241.00 deg, 21.94 deg) | | Max Flux: | 5.66 +/- 2.66 e-12 | (238.71 deg, 23.89 deg) | | Flux at TCrB: | -3.25 +/- 3.27 e-12 | (at TCrB) | cm^-2 s^-1 |
|
|