|
TCrB (2024-04-19 to 2024-04-26) |
|
|
|
Details: |
Significance at TCrB: | 0.00 sigma |
Flux > 1 TeV at TCrB (cm^-2 s^-1): | -3.57 +/- 1.61 e-12 |
Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
: | |
Total Duration of Map: | 152.12 hrs (6.34 days) |
Wgt Average Int Dur: | 2.16 hrs |
Source Transits: | 7.00 |
|
|
Significance: |
|
|
Differential Flux: |
Min Flux: | -1.24 +/- 0.31 e-11 | (239.94 deg, 23.07 deg) | Max Flux: | 3.98 +/- 2.17 e-12 | (241.17 deg, 23.40 deg) | Flux at TCrB: | -5.82 +/- 2.63 e-12 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
Min Flux: | -7.61 +/- 1.91 e-12 | (239.94 deg, 23.07 deg) | Max Flux: | 2.44 +/- 1.33 e-12 | (241.17 deg, 23.40 deg) | Flux at TCrB: | -3.57 +/- 1.61 e-12 | (at TCrB) | cm^-2 s^-1 |
|
|