|
TCrB (2024-05-21 to 2024-05-28) |
|
|
|
Details: |
Significance at TCrB: | 0.00 sigma |
Flux > 1 TeV at TCrB (cm^-2 s^-1): | 3.45 +/- 14.60 e-13 |
Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
: | |
Total Duration of Map: | 154.01 hrs (6.42 days) |
Wgt Average Int Dur: | 2.16 hrs |
Source Transits: | 6.89 |
|
|
Significance: |
|
|
Differential Flux: |
Min Flux: | -8.24 +/- 3.17 e-12 | (239.15 deg, 24.13 deg) | Max Flux: | 5.57 +/- 2.56 e-12 | (239.06 deg, 22.75 deg) | Flux at TCrB: | 5.62 +/- 23.80 e-13 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
Min Flux: | -5.06 +/- 1.95 e-12 | (239.15 deg, 24.13 deg) | Max Flux: | 3.42 +/- 1.57 e-12 | (239.06 deg, 22.75 deg) | Flux at TCrB: | 3.45 +/- 14.60 e-13 | (at TCrB) | cm^-2 s^-1 |
|
|