|
TCrB (2024-06-13 to 2024-06-20) |
|
|
|
Details: |
Significance at TCrB: | 0.00 sigma |
Flux > 1 TeV at TCrB (cm^-2 s^-1): | -1.06 +/- 1.14 e-12 |
Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
: | |
Total Duration of Map: | 149.19 hrs (6.22 days) |
Wgt Average Int Dur: | 2.17 hrs |
Source Transits: | 7.00 |
|
|
Significance: |
|
|
Differential Flux: |
Min Flux: | -1.20 +/- 0.33 e-11 | (240.38 deg, 21.70 deg) | Max Flux: | 3.63 +/- 1.98 e-12 | (240.38 deg, 22.19 deg) | Flux at TCrB: | -1.73 +/- 1.85 e-12 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
Min Flux: | -7.37 +/- 2.03 e-12 | (240.38 deg, 21.70 deg) | Max Flux: | 2.23 +/- 1.22 e-12 | (240.38 deg, 22.19 deg) | Flux at TCrB: | -1.06 +/- 1.14 e-12 | (at TCrB) | cm^-2 s^-1 |
|
|