|
TCrB (2024-06-23 to 2024-06-30) |
|
|
|
Details: |
Significance at TCrB: | 0.00 sigma |
Flux > 1 TeV at TCrB (cm^-2 s^-1): | 1.57 +/- 1.30 e-12 |
Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
: | |
Total Duration of Map: | 142.47 hrs (5.94 days) |
Wgt Average Int Dur: | 2.16 hrs |
Source Transits: | 6.50 |
|
|
Significance: |
|
|
Differential Flux: |
Min Flux: | -1.14 +/- 0.30 e-11 | (241.17 deg, 23.72 deg) | Max Flux: | 3.61 +/- 2.17 e-12 | (240.38 deg, 23.16 deg) | Flux at TCrB: | 2.55 +/- 2.12 e-12 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
Min Flux: | -7.00 +/- 1.85 e-12 | (241.17 deg, 23.72 deg) | Max Flux: | 2.22 +/- 1.33 e-12 | (240.38 deg, 23.16 deg) | Flux at TCrB: | 1.57 +/- 1.30 e-12 | (at TCrB) | cm^-2 s^-1 |
|
|