|
TCrB (2024-06-27 to 2024-07-04) |
|
|
|
Details: |
Significance at TCrB: | 0.00 sigma |
Flux > 1 TeV at TCrB (cm^-2 s^-1): | 1.85 +/- 1390.00 e-15 |
Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
: | |
Total Duration of Map: | 74.99 hrs (3.12 days) |
Wgt Average Int Dur: | 2.16 hrs |
Source Transits: | 3.95 |
|
|
Significance: |
|
|
Differential Flux: |
Min Flux: | -1.56 +/- 0.45 e-11 | (240.73 deg, 24.13 deg) | Max Flux: | 5.63 +/- 2.91 e-12 | (238.97 deg, 21.86 deg) | Flux at TCrB: | 3.02 +/- 2260.00 e-15 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
Min Flux: | -9.57 +/- 2.74 e-12 | (240.73 deg, 24.13 deg) | Max Flux: | 3.46 +/- 1.79 e-12 | (238.97 deg, 21.86 deg) | Flux at TCrB: | 1.85 +/- 1390.00 e-15 | (at TCrB) | cm^-2 s^-1 |
|
|