|
TCrB (2024-07-03 to 2024-07-10) |
|
|
|
Details: |
Significance at TCrB: | 0.00 sigma |
Flux > 1 TeV at TCrB (cm^-2 s^-1): | -1.06 +/- 1.30 e-12 |
Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
: | |
Total Duration of Map: | 145.35 hrs (6.06 days) |
Wgt Average Int Dur: | 2.16 hrs |
Source Transits: | 6.61 |
|
|
Significance: |
|
|
Differential Flux: |
Min Flux: | -1.51 +/- 0.31 e-11 | (239.24 deg, 23.89 deg) | Max Flux: | 3.17 +/- 1.91 e-12 | (239.41 deg, 22.43 deg) | Flux at TCrB: | -1.72 +/- 2.11 e-12 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
Min Flux: | -9.27 +/- 1.88 e-12 | (239.24 deg, 23.89 deg) | Max Flux: | 1.95 +/- 1.17 e-12 | (239.41 deg, 22.43 deg) | Flux at TCrB: | -1.06 +/- 1.30 e-12 | (at TCrB) | cm^-2 s^-1 |
|
|