|
TCrB (2024-07-09 to 2024-07-16) |
|
|
|
Details: |
Significance at TCrB: | 0.00 sigma |
Flux > 1 TeV at TCrB (cm^-2 s^-1): | -1.28 +/- 1.39 e-12 |
Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
: | |
Total Duration of Map: | 147.29 hrs (6.14 days) |
Wgt Average Int Dur: | 2.16 hrs |
Source Transits: | 6.82 |
|
|
Significance: |
|
|
Differential Flux: |
Min Flux: | -1.02 +/- 0.30 e-11 | (238.71 deg, 22.75 deg) | Max Flux: | 3.85 +/- 2.18 e-12 | (241.17 deg, 21.94 deg) | Flux at TCrB: | -2.09 +/- 2.26 e-12 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
Min Flux: | -6.26 +/- 1.85 e-12 | (238.71 deg, 22.75 deg) | Max Flux: | 2.36 +/- 1.34 e-12 | (241.17 deg, 21.94 deg) | Flux at TCrB: | -1.28 +/- 1.39 e-12 | (at TCrB) | cm^-2 s^-1 |
|
|