|
TCrB (2024-07-18 to 2024-07-25) |
|
|
|
Details: |
Significance at TCrB: | 0.00 sigma |
Flux > 1 TeV at TCrB (cm^-2 s^-1): | 1.28 +/- 7.73 e-13 |
Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
: | |
Total Duration of Map: | 151.63 hrs (6.32 days) |
Wgt Average Int Dur: | 2.16 hrs |
Source Transits: | 6.84 |
|
|
Significance: |
|
|
Differential Flux: |
Min Flux: | -1.22 +/- 0.30 e-11 | (241.17 deg, 23.89 deg) | Max Flux: | 5.67 +/- 2.52 e-12 | (241.17 deg, 21.62 deg) | Flux at TCrB: | 2.09 +/- 12.60 e-13 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
Min Flux: | -7.49 +/- 1.85 e-12 | (241.17 deg, 23.89 deg) | Max Flux: | 3.48 +/- 1.55 e-12 | (241.17 deg, 21.62 deg) | Flux at TCrB: | 1.28 +/- 7.73 e-13 | (at TCrB) | cm^-2 s^-1 |
|
|