|
TCrB (2024-07-19 to 2024-07-26) |
|
|
|
Details: |
Significance at TCrB: | 0.00 sigma |
Flux > 1 TeV at TCrB (cm^-2 s^-1): | 1.43 +/- 6630.00 e-16 |
Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
: | |
Total Duration of Map: | 154.01 hrs (6.42 days) |
Wgt Average Int Dur: | 2.16 hrs |
Source Transits: | 6.80 |
|
|
Significance: |
|
|
Differential Flux: |
Min Flux: | -1.12 +/- 0.31 e-11 | (241.17 deg, 23.89 deg) | Max Flux: | 5.45 +/- 2.40 e-12 | (240.82 deg, 22.10 deg) | Flux at TCrB: | 2.33 +/- 10800.00 e-16 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
Min Flux: | -6.87 +/- 1.87 e-12 | (241.17 deg, 23.89 deg) | Max Flux: | 3.34 +/- 1.47 e-12 | (240.82 deg, 22.10 deg) | Flux at TCrB: | 1.43 +/- 6630.00 e-16 | (at TCrB) | cm^-2 s^-1 |
|
|