|
TCrB (2024-07-26 to 2024-08-02) |
|
|
|
Details: |
Significance at TCrB: | 0.00 sigma |
Flux > 1 TeV at TCrB (cm^-2 s^-1): | -3.64 +/- 1.63 e-12 |
Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
: | |
Total Duration of Map: | 153.65 hrs (6.40 days) |
Wgt Average Int Dur: | 2.16 hrs |
Source Transits: | 6.79 |
|
|
Significance: |
|
|
Differential Flux: |
Min Flux: | -1.48 +/- 0.32 e-11 | (240.29 deg, 21.94 deg) | Max Flux: | 3.65 +/- 2.40 e-12 | (240.29 deg, 24.21 deg) | Flux at TCrB: | -5.93 +/- 2.66 e-12 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
Min Flux: | -9.08 +/- 1.93 e-12 | (240.29 deg, 21.94 deg) | Max Flux: | 2.24 +/- 1.47 e-12 | (240.29 deg, 24.21 deg) | Flux at TCrB: | -3.64 +/- 1.63 e-12 | (at TCrB) | cm^-2 s^-1 |
|
|