|
TCrB (2024-07-29 to 2024-08-05) |
|
|
|
Details: |
Significance at TCrB: | 0.00 sigma |
Flux > 1 TeV at TCrB (cm^-2 s^-1): | -8.53 +/- 17.10 e-13 |
Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
: | |
Total Duration of Map: | 136.24 hrs (5.68 days) |
Wgt Average Int Dur: | 2.16 hrs |
Source Transits: | 5.96 |
|
|
Significance: |
|
|
Differential Flux: |
Min Flux: | -1.61 +/- 0.35 e-11 | (238.71 deg, 22.27 deg) | Max Flux: | 6.77 +/- 2.82 e-12 | (240.29 deg, 24.21 deg) | Flux at TCrB: | -1.39 +/- 2.78 e-12 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
Min Flux: | -9.88 +/- 2.14 e-12 | (238.71 deg, 22.27 deg) | Max Flux: | 4.16 +/- 1.73 e-12 | (240.29 deg, 24.21 deg) | Flux at TCrB: | -8.53 +/- 17.10 e-13 | (at TCrB) | cm^-2 s^-1 |
|
|