|
TCrB (2024-07-30 to 2024-08-06) |
|
|
|
Details: |
Significance at TCrB: | 0.00 sigma |
Flux > 1 TeV at TCrB (cm^-2 s^-1): | -1.02 +/- 1.69 e-12 |
Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
: | |
Total Duration of Map: | 136.19 hrs (5.67 days) |
Wgt Average Int Dur: | 2.16 hrs |
Source Transits: | 5.91 |
|
|
Significance: |
|
|
Differential Flux: |
Min Flux: | -1.06 +/- 0.34 e-11 | (238.54 deg, 23.24 deg) | Max Flux: | 3.73 +/- 2.50 e-12 | (240.29 deg, 24.21 deg) | Flux at TCrB: | -1.66 +/- 2.76 e-12 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
Min Flux: | -6.51 +/- 2.11 e-12 | (238.54 deg, 23.24 deg) | Max Flux: | 2.29 +/- 1.53 e-12 | (240.29 deg, 24.21 deg) | Flux at TCrB: | -1.02 +/- 1.69 e-12 | (at TCrB) | cm^-2 s^-1 |
|
|