|
TCrB (2024-08-10 to 2024-08-17) |
|
|
|
Details: |
Significance at TCrB: | 0.00 sigma |
Flux > 1 TeV at TCrB (cm^-2 s^-1): | -2.04 +/- 1.47 e-12 |
Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
: | |
Total Duration of Map: | 154.13 hrs (6.42 days) |
Wgt Average Int Dur: | 2.16 hrs |
Source Transits: | 6.99 |
|
|
Significance: |
|
|
Differential Flux: |
Min Flux: | -1.13 +/- 0.29 e-11 | (240.73 deg, 23.32 deg) | Max Flux: | 4.87 +/- 2.07 e-12 | (239.94 deg, 23.56 deg) | Flux at TCrB: | -3.33 +/- 2.40 e-12 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
Min Flux: | -6.94 +/- 1.80 e-12 | (240.73 deg, 23.32 deg) | Max Flux: | 2.99 +/- 1.27 e-12 | (239.94 deg, 23.56 deg) | Flux at TCrB: | -2.04 +/- 1.47 e-12 | (at TCrB) | cm^-2 s^-1 |
|
|