|
TCrB (2024-08-24 to 2024-08-31) |
|
|
|
Details: |
Significance at TCrB: | 0.00 sigma |
Flux > 1 TeV at TCrB (cm^-2 s^-1): | -1.98 +/- 1.41 e-12 |
Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
: | |
Total Duration of Map: | 153.06 hrs (6.38 days) |
Wgt Average Int Dur: | 2.17 hrs |
Source Transits: | 6.70 |
|
|
Significance: |
|
|
Differential Flux: |
Min Flux: | -1.62 +/- 0.32 e-11 | (240.29 deg, 22.91 deg) | Max Flux: | 5.55 +/- 2.50 e-12 | (241.08 deg, 23.81 deg) | Flux at TCrB: | -3.23 +/- 2.30 e-12 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
Min Flux: | -9.94 +/- 1.99 e-12 | (240.29 deg, 22.91 deg) | Max Flux: | 3.41 +/- 1.53 e-12 | (241.08 deg, 23.81 deg) | Flux at TCrB: | -1.98 +/- 1.41 e-12 | (at TCrB) | cm^-2 s^-1 |
|
|