|
TCrB (2024-08-25 to 2024-09-01) |
|
|
|
Details: |
Significance at TCrB: | 0.00 sigma |
Flux > 1 TeV at TCrB (cm^-2 s^-1): | -2.34 +/- 1.44 e-12 |
Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
: | |
Total Duration of Map: | 152.11 hrs (6.34 days) |
Wgt Average Int Dur: | 2.17 hrs |
Source Transits: | 6.59 |
|
|
Significance: |
|
|
Differential Flux: |
Min Flux: | -1.86 +/- 0.33 e-11 | (240.29 deg, 22.91 deg) | Max Flux: | 5.21 +/- 2.28 e-12 | (241.00 deg, 23.72 deg) | Flux at TCrB: | -3.82 +/- 2.35 e-12 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
Min Flux: | -1.14 +/- 0.20 e-11 | (240.29 deg, 22.91 deg) | Max Flux: | 3.20 +/- 1.40 e-12 | (241.00 deg, 23.72 deg) | Flux at TCrB: | -2.34 +/- 1.44 e-12 | (at TCrB) | cm^-2 s^-1 |
|
|