|
|
TCrB (2025-02-21 to 2025-02-27) |
|
|
|
Details: |
| Significance at TCrB: | 0.00 sigma |
| Flux > 1 TeV at TCrB (cm^-2 s^-1): | 1.41 +/- 1.15 e-12 |
| Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
| : | |
| Total Duration of Map: | 154.69 hrs (6.45 days) |
| Wgt Average Int Dur: | 2.16 hrs |
| Source Transits: | 6.94 |
|
|
Significance: |
|
|
|
Differential Flux: |
| Min Flux: | -1.27 +/- 0.32 e-11 | (241.08 deg, 23.81 deg) | | Max Flux: | 5.25 +/- 2.40 e-12 | (240.21 deg, 22.19 deg) | | Flux at TCrB: | 2.30 +/- 1.87 e-12 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
| Min Flux: | -7.79 +/- 1.96 e-12 | (241.08 deg, 23.81 deg) | | Max Flux: | 3.22 +/- 1.47 e-12 | (240.21 deg, 22.19 deg) | | Flux at TCrB: | 1.41 +/- 1.15 e-12 | (at TCrB) | cm^-2 s^-1 |
|
|