|
|
TCrB (2025-04-05 to 2025-04-11) |
|
|
|
Details: |
| Significance at TCrB: | 0.00 sigma |
| Flux > 1 TeV at TCrB (cm^-2 s^-1): | -4.13 +/- 1.66 e-12 |
| Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
| : | |
| Total Duration of Map: | 155.44 hrs (6.48 days) |
| Wgt Average Int Dur: | 2.17 hrs |
| Source Transits: | 7.00 |
|
|
Significance: |
|
|
|
Differential Flux: |
| Min Flux: | -9.67 +/- 2.98 e-12 | (240.03 deg, 22.99 deg) | | Max Flux: | 6.33 +/- 2.40 e-12 | (240.38 deg, 21.86 deg) | | Flux at TCrB: | -6.73 +/- 2.71 e-12 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
| Min Flux: | -5.94 +/- 1.83 e-12 | (240.03 deg, 22.99 deg) | | Max Flux: | 3.89 +/- 1.47 e-12 | (240.38 deg, 21.86 deg) | | Flux at TCrB: | -4.13 +/- 1.66 e-12 | (at TCrB) | cm^-2 s^-1 |
|
|