|
|
TCrB (2025-04-14 to 2025-04-21) |
|
|
|
Details: |
| Significance at TCrB: | 0.00 sigma |
| Flux > 1 TeV at TCrB (cm^-2 s^-1): | 1.02 +/- 1.24 e-12 |
| Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
| : | |
| Total Duration of Map: | 155.51 hrs (6.48 days) |
| Wgt Average Int Dur: | 2.16 hrs |
| Source Transits: | 7.00 |
|
|
Significance: |
|
|
|
Differential Flux: |
| Min Flux: | -1.42 +/- 0.33 e-11 | (241.00 deg, 23.89 deg) | | Max Flux: | 3.23 +/- 1.93 e-12 | (239.68 deg, 23.97 deg) | | Flux at TCrB: | 1.67 +/- 2.02 e-12 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
| Min Flux: | -8.72 +/- 2.03 e-12 | (241.00 deg, 23.89 deg) | | Max Flux: | 1.98 +/- 1.18 e-12 | (239.68 deg, 23.97 deg) | | Flux at TCrB: | 1.02 +/- 1.24 e-12 | (at TCrB) | cm^-2 s^-1 |
|
|