|
|
TCrB (2025-07-19 to 2025-07-26) |
|
|
|
Details: |
| Significance at TCrB: | 0.00 sigma |
| Flux > 1 TeV at TCrB (cm^-2 s^-1): | 1.52 +/- 1.06 e-12 |
| Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
| : | |
| Total Duration of Map: | 147.59 hrs (6.15 days) |
| Wgt Average Int Dur: | 2.17 hrs |
| Source Transits: | 6.93 |
|
|
Significance: |
|
|
|
Differential Flux: |
| Min Flux: | -9.72 +/- 2.99 e-12 | (238.80 deg, 22.19 deg) | | Max Flux: | 4.89 +/- 2.29 e-12 | (239.50 deg, 24.13 deg) | | Flux at TCrB: | 2.48 +/- 1.73 e-12 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
| Min Flux: | -5.97 +/- 1.84 e-12 | (238.80 deg, 22.19 deg) | | Max Flux: | 3.00 +/- 1.41 e-12 | (239.50 deg, 24.13 deg) | | Flux at TCrB: | 1.52 +/- 1.06 e-12 | (at TCrB) | cm^-2 s^-1 |
|
|