|
|
TCrB (2025-08-26 to 2025-09-02) |
|
|
|
Details: |
| Significance at TCrB: | 0.00 sigma |
| Flux > 1 TeV at TCrB (cm^-2 s^-1): | 5.85 +/- 9.45 e-13 |
| Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
| : | |
| Total Duration of Map: | 148.60 hrs (6.19 days) |
| Wgt Average Int Dur: | 2.18 hrs |
| Source Transits: | 6.96 |
|
|
Significance: |
|
|
|
Differential Flux: |
| Min Flux: | -9.23 +/- 2.93 e-12 | (238.97 deg, 23.32 deg) | | Max Flux: | 3.31 +/- 2.03 e-12 | (238.89 deg, 22.59 deg) | | Flux at TCrB: | 9.53 +/- 15.40 e-13 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
| Min Flux: | -5.66 +/- 1.80 e-12 | (238.97 deg, 23.32 deg) | | Max Flux: | 2.03 +/- 1.25 e-12 | (238.89 deg, 22.59 deg) | | Flux at TCrB: | 5.85 +/- 9.45 e-13 | (at TCrB) | cm^-2 s^-1 |
|
|