|
|
TCrB (2025-09-15 to 2025-09-22) |
|
|
|
Details: |
| Significance at TCrB: | 0.00 sigma |
| Flux > 1 TeV at TCrB (cm^-2 s^-1): | -1.74 +/- 1.52 e-12 |
| Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
| : | |
| Total Duration of Map: | 155.51 hrs (6.48 days) |
| Wgt Average Int Dur: | 2.16 hrs |
| Source Transits: | 6.98 |
|
|
Significance: |
|
|
|
Differential Flux: |
| Min Flux: | -1.31 +/- 0.31 e-11 | (240.91 deg, 23.32 deg) | | Max Flux: | 5.04 +/- 2.10 e-12 | (239.68 deg, 22.19 deg) | | Flux at TCrB: | -2.84 +/- 2.48 e-12 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
| Min Flux: | -8.04 +/- 1.87 e-12 | (240.91 deg, 23.32 deg) | | Max Flux: | 3.09 +/- 1.29 e-12 | (239.68 deg, 22.19 deg) | | Flux at TCrB: | -1.74 +/- 1.52 e-12 | (at TCrB) | cm^-2 s^-1 |
|
|