|
|
TCrB (2025-12-15 to 2025-12-21) |
|
|
|
Details: |
| Significance at TCrB: | 0.00 sigma |
| Flux > 1 TeV at TCrB (cm^-2 s^-1): | -1.10 +/- 0.54 e-11 |
| Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
| : | |
| Total Duration of Map: | 16.50 hrs (0.69 days) |
| Wgt Average Int Dur: | 2.17 hrs |
| Source Transits: | 1.00 |
|
|
Significance: |
|
|
|
Differential Flux: |
| Min Flux: | -8.74 +/- 1.19 e-11 | (240.38 deg, 23.48 deg) | | Max Flux: | 1.15 +/- 0.72 e-11 | (238.54 deg, 23.07 deg) | | Flux at TCrB: | -1.79 +/- 0.88 e-11 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
| Min Flux: | -5.36 +/- 0.73 e-11 | (240.38 deg, 23.48 deg) | | Max Flux: | 7.06 +/- 4.43 e-12 | (238.54 deg, 23.07 deg) | | Flux at TCrB: | -1.10 +/- 0.54 e-11 | (at TCrB) | cm^-2 s^-1 |
|
|