|
|
TCrB (2025-12-24 to 2025-12-30) |
|
|
|
Details: |
| Significance at TCrB: | 0.00 sigma |
| Flux > 1 TeV at TCrB (cm^-2 s^-1): | -6.87 +/- 11.50 e-13 |
| Spectral Assumption: | CutOffPowerLaw,1e-11,2.5,30 |
| : | |
| Total Duration of Map: | 154.00 hrs (6.42 days) |
| Wgt Average Int Dur: | 2.17 hrs |
| Source Transits: | 7.00 |
|
|
Significance: |
|
|
|
Differential Flux: |
| Min Flux: | -1.16 +/- 0.32 e-11 | (238.71 deg, 23.40 deg) | | Max Flux: | 4.19 +/- 2.20 e-12 | (239.94 deg, 21.62 deg) | | Flux at TCrB: | -1.12 +/- 1.88 e-12 | (at TCrB) | TeV^-1 cm^-2 s^-1 |
|
|
Integral Flux >1 TeV: |
| Min Flux: | -7.12 +/- 1.98 e-12 | (238.71 deg, 23.40 deg) | | Max Flux: | 2.57 +/- 1.35 e-12 | (239.94 deg, 21.62 deg) | | Flux at TCrB: | -6.87 +/- 11.50 e-13 | (at TCrB) | cm^-2 s^-1 |
|
|